Turkana County

Solar power in Turkana County.

What solar, battery backup and EV charging look like in Turkana: Lodwar's solar resource month by month, what a typical system produces, local design points for a arid climate, and a calculator using your KPLC bill.

Solar resource

6.3 peak sun hours a day

Lodwar receives 6.3 kWh/m² of solar energy a day, so each kilowatt of panels produces roughly 1,798 kWh a year. November is the weakest month; size essential loads to still work then.

Resource

Some of Kenya's strongest sun

Arid counties receive high, steady solar energy, so each panel produces more than in the highlands. Plan the array for the hottest months, when heat derates output.

Dust

Plan for cleaning

Dust and sand settle on panels and can cut output noticeably between rains. Budget for regular cleaning and choose a tilt that sheds dust and rain.

Off-grid

Solar first, diesel as backup

Many sites are far from the grid or have weak supply. Solar with batteries or water storage usually costs less per kWh than running a diesel generator.

Solar water pumping

Monthly solar resource in Lodwar

Long-term average daily solar energy on a horizontal surface and air temperature from NASA POWER, with the output of an example 5 kW system. Near the equator a low-tilt array receives close to the horizontal value.

MonthSolar energy (kWh/m²/day)Air temperature (°C)5 kW system output (kWh)
January6.4929.3785
February6.7630.6738
March6.6330.9801
April6.1229.8716
May6.2629.2757
June6.0328.6706
July5.9828.2723
August6.3828.7771
September6.7729.8792
October6.3230.0764
November5.9529.0696
December6.1328.8741
Year6.32 average29.4 average8,989

Estimate a system in Turkana

Your electricity use
About 530 kWh a month at KES 28/kWh all-in.
Homes are often 30 to 50%, offices, shops and schools 60 to 80%.
Backup during outages
Lights, sockets, fridge, router. 0 for no battery.
EV charging
Targets
Enter a total installed price to see simple payback.
Solar array
3.10 kWp
5 × 620 W panels, about 14 m² of roof
Inverter
3 kW
Hybrid, with battery
Battery
6.0 kWh usable
About 6.7 kWh nominal lithium (LiFePO₄)
Estimated savings
KES 12,452/month
83% of energy charges, KES 149,422 a year
Solar generation
5,573 kWh/year
5,280 kWh used on site
Simple payback
Add a quote
Before financing and maintenance
Monthly solar generation against your monthly use (530 kWh)
Show monthly table
MonthGenerated (kWh)Used on site (kWh)Savings
Jan486456KES 12,908
Feb458412KES 11,659
Mar497456KES 12,908
Apr444429KES 12,147
May469453KES 12,832
Jun438423KES 11,985
Jul448434KES 12,275
Aug478456KES 12,908
Sep491441KES 12,491
Oct473456KES 12,908
Nov431418KES 11,825
Dec460444KES 12,578

Want this sized with real equipment, cable runs and supplier prices?

Get a detailed plan

Estimate only. It uses NASA POWER long-term modelled data for Lodwar, a 78% performance ratio and reviewed KPLC all-in energy rates. Fixed and demand charges, shading, export credit and tariff changes are not included.

Frequently asked questions

How much sun does Turkana get for solar?

Lodwar receives about 6.3 kWh of solar energy per square metre per day on average (6.3 peak sun hours). September is the strongest month at 6.8 and November the weakest at 5.9. Source: NASA POWER long-term modelled data for Lodwar.

How much does a 5 kW solar system produce in Turkana?

About 8,989 kWh a year, or 24.6 kWh a day on average, assuming a 78% performance ratio for heat, dust, wiring and inverter losses. Output ranges from about 696 kWh in November to 792 kWh in September.

How many solar panels does a home in Turkana need?

A home using 300 kWh a month with half of it in daylight needs about 1.0 kW of solar for its daytime use, which is 2 panels of 620 W. Covering evening use as well needs a battery and a larger array. Use the calculator on this page with your own bill.

Can StimaPulse plan a solar, battery or EV charging project in Turkana?

Yes. StimaPulse sizes solar, storage and EV charging for homes, schools, businesses and fleets anywhere in Turkana County, using your bills or meter data, the site's own solar resource, real equipment and supplier quotes. A licensed engineer must verify the final design before installation.

Get a plan for your site.

Bring a utility bill, load list, fleet schedule or supplier quote. We will turn it into a sized, costed and comparable plan.

Request an assessment