Samburu County

Solar power in Samburu County.

What solar, battery backup and EV charging look like in Samburu: Maralal's solar resource month by month, what a typical system produces, local design points for a arid climate, and a calculator using your KPLC bill.

Solar resource

6.3 peak sun hours a day

Maralal receives 6.3 kWh/m² of solar energy a day, so each kilowatt of panels produces roughly 1,785 kWh a year. July is the weakest month; size essential loads to still work then.

Resource

Some of Kenya's strongest sun

Arid counties receive high, steady solar energy, so each panel produces more than in the highlands. Plan the array for the hottest months, when heat derates output.

Dust

Plan for cleaning

Dust and sand settle on panels and can cut output noticeably between rains. Budget for regular cleaning and choose a tilt that sheds dust and rain.

Off-grid

Solar first, diesel as backup

Many sites are far from the grid or have weak supply. Solar with batteries or water storage usually costs less per kWh than running a diesel generator.

Solar water pumping

Monthly solar resource in Maralal

Long-term average daily solar energy on a horizontal surface and air temperature from NASA POWER, with the output of an example 5 kW system. Near the equator a low-tilt array receives close to the horizontal value.

MonthSolar energy (kWh/m²/day)Air temperature (°C)5 kW system output (kWh)
January6.6220.0801
February6.9221.1756
March6.7321.9813
April6.1921.5725
May6.2421.1755
June5.8120.5680
July5.5919.8676
August6.0720.0733
September6.7021.0784
October6.2621.2757
November5.9220.3692
December6.1619.7745
Year6.27 average20.7 average8,918

Estimate a system in Samburu

Your electricity use
About 530 kWh a month at KES 28/kWh all-in.
Homes are often 30 to 50%, offices, shops and schools 60 to 80%.
Backup during outages
Lights, sockets, fridge, router. 0 for no battery.
EV charging
Targets
Enter a total installed price to see simple payback.
Solar array
3.72 kWp
6 × 620 W panels, about 17 m² of roof
Inverter
3 kW
Hybrid, with battery
Battery
6.0 kWh usable
About 6.7 kWh nominal lithium (LiFePO₄)
Estimated savings
KES 12,665/month
84% of energy charges, KES 151,977 a year
Solar generation
6,635 kWh/year
5,370 kWh used on site
Simple payback
Add a quote
Before financing and maintenance
Monthly solar generation against your monthly use (530 kWh)
Show monthly table
MonthGenerated (kWh)Used on site (kWh)Savings
Jan596456KES 12,908
Feb562412KES 11,659
Mar605456KES 12,908
Apr539441KES 12,491
May562456KES 12,908
Jun506441KES 12,491
Jul503456KES 12,908
Aug546456KES 12,908
Sep583441KES 12,491
Oct563456KES 12,908
Nov515441KES 12,491
Dec554456KES 12,908

Want this sized with real equipment, cable runs and supplier prices?

Get a detailed plan

Estimate only. It uses NASA POWER long-term modelled data for Maralal, a 78% performance ratio and reviewed KPLC all-in energy rates. Fixed and demand charges, shading, export credit and tariff changes are not included.

Frequently asked questions

How much sun does Samburu get for solar?

Maralal receives about 6.3 kWh of solar energy per square metre per day on average (6.3 peak sun hours). February is the strongest month at 6.9 and July the weakest at 5.6. Source: NASA POWER long-term modelled data for Maralal.

How much does a 5 kW solar system produce in Samburu?

About 8,918 kWh a year, or 24.4 kWh a day on average, assuming a 78% performance ratio for heat, dust, wiring and inverter losses. Output ranges from about 676 kWh in July to 756 kWh in February.

How many solar panels does a home in Samburu need?

A home using 300 kWh a month with half of it in daylight needs about 1.0 kW of solar for its daytime use, which is 2 panels of 620 W. Covering evening use as well needs a battery and a larger array. Use the calculator on this page with your own bill.

Can StimaPulse plan a solar, battery or EV charging project in Samburu?

Yes. StimaPulse sizes solar, storage and EV charging for homes, schools, businesses and fleets anywhere in Samburu County, using your bills or meter data, the site's own solar resource, real equipment and supplier quotes. A licensed engineer must verify the final design before installation.