Solar resource

6.2 peak sun hours a day

Meru receives 6.2 kWh/m² of solar energy a day, so each kilowatt of panels produces roughly 1,765 kWh a year. July is the weakest month; size essential loads to still work then.

Seasons

Plan for the cloudy months

Highland output dips during the long rains and the cool, overcast June to August period. Size the system on the yearly total and check that the low months still cover essential loads.

Cooler air

Cool temperatures help panels

Panels lose efficiency as they heat up, so cooler highland air partly offsets the cloudier months.

Grid and tariffs

Savings at KPLC rates

Most sites are on the grid, so savings come from replacing energy you would otherwise buy at your all-in KPLC rate, plus backup during outages.

Kenya electricity tariffs

Monthly solar resource in Meru

Long-term average daily solar energy on a horizontal surface and air temperature from NASA POWER, with the output of an example 5 kW system. Near the equator a low-tilt array receives close to the horizontal value.

MonthSolar energy (kWh/m²/day)Air temperature (°C)5 kW system output (kWh)
January6.5017.4785
February6.9018.4753
March6.7119.0812
April6.1318.5717
May6.2017.7750
June5.7417.0672
July5.5716.5674
August6.0016.8725
September6.6917.8783
October6.2618.1757
November5.7117.4668
December5.9617.0720
Year6.20 average17.6 average8,817

Estimate a system in Meru

Your electricity use
About 530 kWh a month at KES 28/kWh all-in.
Homes are often 30 to 50%, offices, shops and schools 60 to 80%.
Backup during outages
Lights, sockets, fridge, router. 0 for no battery.
EV charging
Targets
Enter a total installed price to see simple payback.
Solar array
3.72 kWp
6 × 620 W panels, about 17 m² of roof
Inverter
3 kW
Hybrid, with battery
Battery
6.0 kWh usable
About 6.7 kWh nominal lithium (LiFePO₄)
Estimated savings
KES 12,665/month
84% of energy charges, KES 151,977 a year
Solar generation
6,560 kWh/year
5,370 kWh used on site
Simple payback
Add a quote
Before financing and maintenance
Monthly solar generation against your monthly use (530 kWh)
Show monthly table
MonthGenerated (kWh)Used on site (kWh)Savings
Jan584456KES 12,908
Feb560412KES 11,659
Mar604456KES 12,908
Apr533441KES 12,491
May558456KES 12,908
Jun500441KES 12,491
Jul501456KES 12,908
Aug539456KES 12,908
Sep582441KES 12,491
Oct563456KES 12,908
Nov497441KES 12,491
Dec536456KES 12,908

Want this sized with real equipment, cable runs and supplier prices?

Get a detailed plan

Estimate only. It uses NASA POWER long-term modelled data for Meru, a 78% performance ratio and reviewed KPLC all-in energy rates. Fixed and demand charges, shading, export credit and tariff changes are not included.

Frequently asked questions

How much sun does Meru get for solar?

Meru receives about 6.2 kWh of solar energy per square metre per day on average (6.2 peak sun hours). February is the strongest month at 6.9 and July the weakest at 5.6. Source: NASA POWER long-term modelled data for Meru.

How much does a 5 kW solar system produce in Meru?

About 8,817 kWh a year, or 24.2 kWh a day on average, assuming a 78% performance ratio for heat, dust, wiring and inverter losses. Output ranges from about 674 kWh in July to 753 kWh in February.

How many solar panels does a home in Meru need?

A home using 300 kWh a month with half of it in daylight needs about 1.0 kW of solar for its daytime use, which is 2 panels of 620 W. Covering evening use as well needs a battery and a larger array. Use the calculator on this page with your own bill.

Can StimaPulse plan a solar, battery or EV charging project in Meru?

Yes. StimaPulse sizes solar, storage and EV charging for homes, schools, businesses and fleets anywhere in Meru County, using your bills or meter data, the site's own solar resource, real equipment and supplier quotes. A licensed engineer must verify the final design before installation.

Get a plan for your site.

Bring a utility bill, load list, fleet schedule or supplier quote. We will turn it into a sized, costed and comparable plan.

Request an assessment