Embu County

Solar power in Embu County.

What solar, battery backup and EV charging look like in Embu: the county's solar resource month by month, what a typical system produces, local design points for a highland climate, and a calculator using your KPLC bill.

Solar resource

5.5 peak sun hours a day

Embu receives 5.5 kWh/m² of solar energy a day, so each kilowatt of panels produces roughly 1,568 kWh a year. July is the weakest month; size essential loads to still work then.

Seasons

Plan for the cloudy months

Highland output dips during the long rains and the cool, overcast June to August period. Size the system on the yearly total and check that the low months still cover essential loads.

Cooler air

Cool temperatures help panels

Panels lose efficiency as they heat up, so cooler highland air partly offsets the cloudier months.

Grid and tariffs

Savings at KPLC rates

Most sites are on the grid, so savings come from replacing energy you would otherwise buy at your all-in KPLC rate, plus backup during outages.

Kenya electricity tariffs

Monthly solar resource in Embu

Long-term average daily solar energy on a horizontal surface and air temperature from NASA POWER, with the output of an example 5 kW system. Near the equator a low-tilt array receives close to the horizontal value.

MonthSolar energy (kWh/m²/day)Air temperature (°C)5 kW system output (kWh)
January6.1820.8748
February6.5421.8714
March6.3122.3763
April5.6321.3659
May5.3420.2646
June4.6119.2540
July4.3118.7521
August4.6219.1558
September5.6320.3659
October5.7620.9697
November5.4520.4638
December5.6920.2688
Year5.51 average20.4 average7,829

Estimate a system in Embu

Your electricity use
About 530 kWh a month at KES 28/kWh all-in.
Homes are often 30 to 50%, offices, shops and schools 60 to 80%.
Backup during outages
Lights, sockets, fridge, router. 0 for no battery.
EV charging
Targets
Enter a total installed price to see simple payback.
Solar array
3.72 kWp
6 × 620 W panels, about 17 m² of roof
Inverter
3 kW
Hybrid, with battery
Battery
6.0 kWh usable
About 6.7 kWh nominal lithium (LiFePO₄)
Estimated savings
KES 12,238/month
82% of energy charges, KES 146,853 a year
Solar generation
5,824 kWh/year
5,189 kWh used on site
Simple payback
Add a quote
Before financing and maintenance
Monthly solar generation against your monthly use (530 kWh)
Show monthly table
MonthGenerated (kWh)Used on site (kWh)Savings
Jan556456KES 12,908
Feb531412KES 11,659
Mar567456KES 12,908
Apr490441KES 12,491
May480456KES 12,908
Jun402390KES 11,049
Jul388378KES 10,708
Aug415404KES 11,425
Sep490441KES 12,491
Oct518456KES 12,908
Nov474441KES 12,491
Dec512456KES 12,908

Want this sized with real equipment, cable runs and supplier prices?

Get a detailed plan

Estimate only. It uses NASA POWER long-term modelled data for Embu, a 78% performance ratio and reviewed KPLC all-in energy rates. Fixed and demand charges, shading, export credit and tariff changes are not included.

Frequently asked questions

How much sun does Embu get for solar?

Embu receives about 5.5 kWh of solar energy per square metre per day on average (5.5 peak sun hours). February is the strongest month at 6.5 and July the weakest at 4.3. Source: NASA POWER long-term modelled data for Embu.

How much does a 5 kW solar system produce in Embu?

About 7,829 kWh a year, or 21.4 kWh a day on average, assuming a 78% performance ratio for heat, dust, wiring and inverter losses. Output ranges from about 521 kWh in July to 714 kWh in February.

How many solar panels does a home in Embu need?

A home using 300 kWh a month with half of it in daylight needs about 1.1 kW of solar for its daytime use, which is 2 panels of 620 W. Covering evening use as well needs a battery and a larger array. Use the calculator on this page with your own bill.

Can StimaPulse plan a solar, battery or EV charging project in Embu?

Yes. StimaPulse sizes solar, storage and EV charging for homes, schools, businesses and fleets anywhere in Embu County, using your bills or meter data, the site's own solar resource, real equipment and supplier quotes. A licensed engineer must verify the final design before installation.

Get a plan for your site.

Bring a utility bill, load list, fleet schedule or supplier quote. We will turn it into a sized, costed and comparable plan.

Request an assessment