Vihiga County

Solar power in Vihiga County.

What solar, battery backup and EV charging look like in Vihiga: Mbale's solar resource month by month, what a typical system produces, local design points for a lake basin and western climate, and a calculator using your KPLC bill.

Solar resource

5.9 peak sun hours a day

Mbale receives 5.9 kWh/m² of solar energy a day, so each kilowatt of panels produces roughly 1,672 kWh a year. July is the weakest month; size essential loads to still work then.

Rain

Frequent afternoon storms

The Lake Victoria basin and western highlands see frequent rain and afternoon thunderstorms. Fit surge protection on both DC and AC sides and good earthing.

Agriculture

Cold storage and processing

Farms, cooperatives and fish landing sites use solar for cooling, milling and processing, where daytime loads match solar output.

Mobility

Electric boda bodas

Electric motorcycles are a growing market. Daytime solar charging or battery swapping stations can cut charging costs.

EV charging planning

Monthly solar resource in Mbale

Long-term average daily solar energy on a horizontal surface and air temperature from NASA POWER, with the output of an example 5 kW system. Near the equator a low-tilt array receives close to the horizontal value.

MonthSolar energy (kWh/m²/day)Air temperature (°C)5 kW system output (kWh)
January6.2120.8751
February6.4921.8709
March6.3222.2765
April5.9121.1691
May5.7220.3692
June5.3019.6620
July5.2019.3629
August5.5519.7670
September6.0620.5710
October5.9620.8720
November5.8120.4679
December5.9420.3718
Year5.87 average20.5 average8,354

Estimate a system in Vihiga

Your electricity use
About 530 kWh a month at KES 28/kWh all-in.
Homes are often 30 to 50%, offices, shops and schools 60 to 80%.
Backup during outages
Lights, sockets, fridge, router. 0 for no battery.
EV charging
Targets
Enter a total installed price to see simple payback.
Solar array
3.72 kWp
6 × 620 W panels, about 17 m² of roof
Inverter
3 kW
Hybrid, with battery
Battery
6.0 kWh usable
About 6.7 kWh nominal lithium (LiFePO₄)
Estimated savings
KES 12,655/month
84% of energy charges, KES 151,865 a year
Solar generation
6,215 kWh/year
5,366 kWh used on site
Simple payback
Add a quote
Before financing and maintenance
Monthly solar generation against your monthly use (530 kWh)
Show monthly table
MonthGenerated (kWh)Used on site (kWh)Savings
Jan559456KES 12,908
Feb527412KES 11,659
Mar569456KES 12,908
Apr514441KES 12,491
May515456KES 12,908
Jun461441KES 12,491
Jul468452KES 12,796
Aug499456KES 12,908
Sep528441KES 12,491
Oct536456KES 12,908
Nov505441KES 12,491
Dec535456KES 12,908

Want this sized with real equipment, cable runs and supplier prices?

Get a detailed plan

Estimate only. It uses NASA POWER long-term modelled data for Mbale, a 78% performance ratio and reviewed KPLC all-in energy rates. Fixed and demand charges, shading, export credit and tariff changes are not included.

Frequently asked questions

How much sun does Vihiga get for solar?

Mbale receives about 5.9 kWh of solar energy per square metre per day on average (5.9 peak sun hours). February is the strongest month at 6.5 and July the weakest at 5.2. Source: NASA POWER long-term modelled data for Mbale.

How much does a 5 kW solar system produce in Vihiga?

About 8,354 kWh a year, or 22.9 kWh a day on average, assuming a 78% performance ratio for heat, dust, wiring and inverter losses. Output ranges from about 629 kWh in July to 709 kWh in February.

How many solar panels does a home in Vihiga need?

A home using 300 kWh a month with half of it in daylight needs about 1.1 kW of solar for its daytime use, which is 2 panels of 620 W. Covering evening use as well needs a battery and a larger array. Use the calculator on this page with your own bill.

Can StimaPulse plan a solar, battery or EV charging project in Vihiga?

Yes. StimaPulse sizes solar, storage and EV charging for homes, schools, businesses and fleets anywhere in Vihiga County, using your bills or meter data, the site's own solar resource, real equipment and supplier quotes. A licensed engineer must verify the final design before installation.

Get a plan for your site.

Bring a utility bill, load list, fleet schedule or supplier quote. We will turn it into a sized, costed and comparable plan.

Request an assessment